Wednesday, February 15, 2012
Monday, February 13, 2012
Maze Update
The bots goal was to move 1/4 through the maze using non-verbal navigation systems designed by the robot engineering teams.
Maze Update
Wednesday, February 1, 2012
Left Turn in the Maze
Engineering Development Teams had a "Challenge Test" today in which their robots need to make a left turn in the maze. One of the teams was able to run the WHOLE maze in 2 minutes!!!
Left Turn in the Maze
Subscribe to:
Posts (Atom)